Final Drive & Swing Components for Excavators:Planetary drive gears must withstand the high forces of torque generated by the engine and transfer these loads to move the equipment.All Raydafon gears and final drive gears are manufactured to precise tolerances for reliable operation. The manufacturing method includes a heat treatment process that increases bending strength, prevents case crushing and provides exceptional wear resistancefor a long service life.| PART NAME | APPLY TO KOMATSU PC220-7 TRAVEL DRIVE TRANSMISSION |
| EQUIPMENT | APPLY FOR Excavator KOMATSU PC220-7 |
| STOCK CODE | 9202971 |
| Part No | 206-27-00300 206-27-00301 207-27-00273 |
| FRAME HOLES | 18 |
| SPROCKET HOLES | 20 |
| CATEGORY | Construction Machinery Parts, Excavator Spare Parts |
| APPLICATION | Replacement |
| ITEM CONDITION | NEW |
| LOGO | Raydafon |
| MOQ | 1 pc |
Company Profile

Why Choose Us1. We are the manufacturer and own18000 m2 factory areas, good relationship withmaterial suppliers, which make more competitive price and steady quality.2. We have more than80 unitsadvanced facilities for production.3. We have 8 senior engineers with more than30 years experienceon designing andmachining.4. Our sales term offer theefficient servicefor every customers.5. We are thelong term parts supplierfor many famous companies, such as FOSTER 6. We develop spare parts forold and new excavatormodels, and submit our latest productsto customers every month so that to meet the market demand.7. We havehigh market sharein Oversea market and Domestic market, Southeast Asia 65%,Middle East 8%, North and South America 10%,Europe 8%, Russia 5%.
1. Warranty Type:We will replace the product which have quality problem.2. Warranty Period:Supply 3 months warranty for the products from the date of arrival. Customer should check the items according to the order listafter arrival. Contact with us and offer the data, photos of the problem items.3. You need to pay for the replacement charge for following condition:* Wrong Order from customer.* Natural Disasters cause the damage.* Error installation.* The machine and reducer work over time and over load.* Lost by any condition.* Human element destroyed.* Corrode with rust during stock and running.* Warranty Expired.4. OthersThey are the product easy to be rust away, please wrap them well. We just supply warranty for the products we are producing,except the Bearing, Seal, and some others we mention before order.If there is any problem about the products, installation ormaintenance, please contact with us any time. We reserve the rights of final interpretation.Packaging & Shipping| TRADE TERMS | EXW, FOB, CFR, CIF |
| PAYMENT TERMS | T/T, Western Union, Escrow |
| PORT | Jiangmen Port, negotiation |
| LEAD TIME | 1. Stock in hand: 4-7 days for processing and packing2. Bulk Production: 10-35 days, depend on the quantity. |
| DELIVERY | By Sea, Air, Carrier |
| ORDER FLOW | 1. Customers offer the part number, part name, model, quantity, data of items, delivery term.2. We quote the best price according to the requirement of customers.3. Confirm the purchase order and pay the deposit.4. We prepare and pack the goods.5. Customers make the payment according to the Proforma Invoice once the goods get ready for delivery.6. We delivery the goods with the packing list, commercial invoice, B/L and other documents requested.7. Track the transport and arrival about the goods.8. Welcome to give us suggestion and feedback once arrival. |
Recommend Products
Address
Luotuo Industrial Area, Zhenhai District, Ningbo City, China
Tel
